Osmond Resources
OSMOND RESOURCES · CRITICAL MINERALS · ANDALUCÍA, SPAIN · ASX: OSM

Uniquely positioned with possibility for three economic minerals.

Osmond Resources Limited is an ASX listed company focused on fast-tracking the development of EU Critical Minerals Projects.

Project·ExplorationJORC·Not yet declaredEU CRMA 2024·Strategic + Critical
FIG. 01 — TRANSITION MATERIALS · ROCK → MACHINE
Mineral
MONAZITE
Elements
Nd·Pr·Dy·Tb
Ends up in
EV motors · wind turbines
Mineral
ZIRCON
Elements
Zr·Hf
Ends up in
Nuclear fuel cladding · control rods
Mineral
RUTILE
Elements
Ti
Ends up in
Lightweighting · aerospace · hydrogen

The same rock, building the warm future. Rock on the left, the energy transition on the right, Osmond in the middle.

§ 01The Proposition
A

High Grade

  • Outcrop samples containing up to ~40% Total Heavy Minerals (THM).
  • High grades of Rutile (titanium), Zircon (zirconium / hafnium) and Monazite (rare earth elements REE).
B

High Value

  • Three Economic Minerals: Rutile · Zircon · Monazite.
C

High Tonnage

  • Two interpreted pervasive seams.
  • Mineralised outcrops over 12 km apart.
  • 232 km² permit area.
D

EU Critical Minerals

  • EU Critical Materials Act 2024.
  • Three of 17 Strategic Critical Materials.
  • Five of 34 Critical Materials.
  • Spanish Mineral Raw Materials Plan — 2025 to 2029.
§ 02Flagship

Orión EU Critical Minerals Project

Jaén Province · Andalucía · Spain
  • 772 'cuadrículas mineras' covering an area of ~232 km².
  • Two seams that appear to be pervasive across the permit.
  • Mineralised outcrops over 12 km apart.
  • Historically unsuccessfully explored for the mineralisation styles now targeted.
  • Maiden Mineral Resource Estimate and Scoping Study targeted upon Scoping Study.
Project·ExplorationJORC·Not yet declared
TABLE 01 — PROJECT SUMMARY
TickerASX: OSM
Permit area~232 km²
Cuadrículas mineras772
Economic mineralsRutile · Zircon · Monazite
Outcrop spread> 12 km apart
Seams (interpreted)Two, appear pervasive
JurisdictionAndalucía, Spain (EU)
StageExploration
MRE + Scoping StudyTargeted before end Q3 CY26
§ 03Latest Results

SOR-08A — 2.7 m from 209.7 m.

TABLE 02 — INTERCEPTS · SOR-08A
IntervalTiO₂ZrO₂HfO₂TREO
2.7 m from 209.7 m10.75%3.82%815 ppm0.784%
incl. 1.2 m from 210.0 m17.16%6.55%1,401 ppm1.324%

Exploration results only. Mineral percentages are mass-balance estimates. No JORC-compliant Mineral Resource or Reserve; maiden MRE and Scoping Study targeted before end Q3 CY26. ASX release 16 July 2026.

§ 04Announcements

The record.

16 Jul 2026Mineral Resource Target Area ExpandedPDF →
03 Jul 2026Positive Initiatives to Drive Shareholder ValuePDF →
22 Jun 2026Step-out drilling intersects prospective stratigraphyPDF →
14 Jun 2026Quarterly Activities and Cashflow ReportPDF →
28 May 2026Investor Presentation — EU Critical MineralsPDF →